I just stumbled across this great summary of Scrum by William Wake: “Scrum on a Page” as Word or PDF files. My only quibble – all the times are tied to the original fixed iteration length of 30 days. I would’ve tried to squeeze in the more flexible approach.
With apologies to my regular readers for my long absence – we just a had our second child (last week) and I’m just getting back into the swing of things. BTW Like Tim Bray I won’t name my kids or put their pictures in my blog. So this is as much announcement as there will be.
Leave a Reply